Packaging engineering

A better pack starts here.

Audit the pack you already ship, build a new structure, or test how it performs on the route.

Hands using a digital caliper to measure a corrugated fiberboard sample on a graphite mat.

Start with the route.

Show us what you ship and how it travels. We can scope the work around an existing problem, a new product, or a packaging design that needs validation.

Explore the Transit Lab ↗

What you get

Packaging audit

Find the likely source of damage or inconsistency in your current pack.

A prioritized review of fit, materials and packing steps.

View service ↗

Structural design

Prototype a carton and insert around the product, line and supplier constraints.

Dielines, physical samples and an assembly recommendation.

View service ↗

Transit testing

Review the prototype against relevant handling, vibration and stacking conditions.

A test plan, evidence from the samples and a list of design revisions.

View service ↗

Brief an audit ↗

Read the field guides ↗

Three ways to work together.

2 weeks

Audit sprint

A damage review, a ranked list of changes and one drop test on the pack you ship today.

4 to 6 weeks

Design and prototype

Structural design, three bench prototypes and a test report on the version we recommend.

Per quarter

Ongoing testing

A fixed number of test days each quarter for new products, supplier changes and seasonal packs.

Create a free website with Framer, the website builder loved by startups, designers and agencies.